Commercial roof coatings in Lewisville, TX
Commercial roof coatings in silicone and elastomeric extend a sound flat roof. They cannot rescue a wet one.
A moisture scan comes first, before any coating goes down.
Commercial roof coatings in Lewisville, TX buy years, not a new roof
Commercial roof coatings in Lewisville, TX are a life-extension for a roof that is fundamentally sound. A coating seals the surface, bridges small imperfections and reflects heat, and on the right roof it adds real years at a fraction of a replacement.
On the wrong roof it does harm. Coating over wet insulation seals the water underneath and takes away the evaporation path, so the assembly degrades faster with the coating than without it. Establishing which roof you have is the first step and it is not optional.
- Right roof: membrane intact, insulation dry, seams and details sound
- Wrong roof: wet insulation, failed seams, or an assembly at the end of its life
- The test: a moisture scan, before anyone quotes a coating

Cleaning, seam reinforcement, primer and the coat itself
Most of the labor and most of the failures are in the preparation, so a bid that goes light on the first three steps is a bid worth questioning. A coating only suits a sound roof; where it is not, a recover or a full tear-off is the answer.
- 01Moisture survey
- Infrared or capacitance scanning to find wet insulation. This decides whether the job proceeds at all.
- 02Cleaning
- Power washing to remove dirt, chalk and biological growth. A coating over a dirty roof fails at the bond.
- 03Repairs and seam reinforcement
- Open seams, splits and failed terminations repaired and reinforced with fabric before anything is coated.
- 04Primer
- Where the substrate requires it. Some membranes need it and some do not, and the manufacturer specification decides.
- 05The coating
- Applied at the specified thickness in one or two passes, which is what the warranty term depends on.
- 06Details
- Curbs, drains, penetrations and parapets coated and reinforced individually.
Application and its workmanship warranty belong to the roofer; the coating warranty comes from the manufacturer.
The roof gets tested for moisture before anything is coated
Sequence, with a genuine stop condition at step one.
Moisture scan and survey
Wet areas mapped. If there are many, a coating stops being the answer and the conversation turns to recover or tear-off.
Wash and dry
The roof is cleaned and left to dry completely. Coating over trapped moisture at the surface fails as surely as coating over wet insulation.
Repairs and reinforcement
Seams, splits and terminations addressed with fabric reinforcement where the specification calls for it.
Coat, at thickness, and inspect
Applied to the specified mil thickness and checked, because the warranty depends on the thickness achieved.
Silicone against elastomeric, and when a coating is the wrong call
Including the answer to when you should be told no.
Silicone or elastomeric acrylic?
When is a coating the wrong call?
How long does a coating last?
Will a coating stop an active leak?
Does a coating count as a new roof for insurance?

A moisture scan decides whether coating is even possible
The scan is the honest first step, and it is the one that can rule the whole service out. A roofer who scans first and then tells you a coating is the wrong answer has saved you the cost of finding out slowly.